![5 Mile Force](/wp-content/uploads/2015/08/5-Mile-Force-1024x688.png)
The Atlantic Group provided a five mile force main design for the connection of OOEA#2, Pump Station #4 to the Inland Bays Regional Wastewater Facility. Our firm developed the design of a 12 inch and 16 inch force main for the required flows, the minimum scouring velocity, a future connection point, multiple air release valves, all road crossings, and connection into the Facility’s headworks.